From purchase to installation, what do we need?

Some customers may be the first contact with our equipment, before the purchase of equipment, you need to do to prepare?


First, which steel pipe you want production? In your market.

1.Steel pipe material: carbon steel, galvanized steel, aluminum, copper, or stainless steel.

2.Steel pipe size: diameter and thickness...

3.Steel pipe model: square, round, LTZ...


How many area of you factory?

The production line size: length 50-80m × width 4-6m × high 5-6m, so you factory need to meet that size.


How much electricity you have?

The production line electricity is min 200Kw, according to your steel pipe size, if the steel pipe size is big, so the electricity is big.


If you have meet and know the above question. then you can ask our which production line you can buy.


Second, for the production line, what's your requirement?

1.For the production speed, high or low?

2.For the tube end face: have glitch and no glitch (the cutting machine is different, and the price is also different)

3.Other technical question...


For the factory, strength, scope, quality assurance, after-sales service.


At last, installation.

1.after you pay the prepayment, we will send the factory layout to you, you can building the ground.

2.for the more information please contact us, we will give a you best proposal.