News

Welded pipe mill commissioning and routine maintenance precautions

Welded pipe mill can be so widely used with it own advantages are inseparable. Development of welded pipe industry so quickly to stay ahead, we need to improve production quality welded pipe, the pipe unit commissioning and do routine maintenance work. So what routine maintenance and debugging welded pipe mill should pay attention to?
   In general, the development of pipe unit must comply with safety rules, the operator during the operation of the unit and must not contact the mold, but also pay attention to the direction of his hand on the tube, to avoid improper operation impact on their health and safety . In addition welded pipe mill operator before operating the unit should pay attention to the lubrication points are lubricated in place, or we need to pay attention to the addition of a number of oil, to ensure the normal operation of the unit and can work. Welded pipe during use to pay attention to the use of some of the high-temperature synthetic aluminum complex grease, pipe unit to avoid damage.
   Also note that the adjustment pipe unit saw fly one-way valve, pay attention to flying saw cars and steel production to keep pace, which can effectively prevent the blade from being damaged.
   Also in daily life but also pay attention to the pipe unit regular inspection and maintenance, timely understanding of the performance of welded pipe, if there is a fault, then we should pay attention to this timely yong corresponding measures for repair.

CONTACT US

Contact: Steven Ma

Phone: 86 18321624120

Tel: 86 021 58307665

Email: stevenma@shsinopower.com

Add: Pudong Shanghai ,China

Scan the qr codeClose
the qr code